WT was retained by the Toronto District School Board to develop a new design and Engineering Evaluation Report for their outdoor education centre located north of Orangeville. The existing system was from 2002 and many of the components were obsolete or at the end of their useful life. The system was reconfigured to treat the water first and then store treated water to address peak demands with a VFD booster pump system. Once the work was complete, we developed the Engineering Evaluation Report and O&M recommendations for the new system.

Location

Dufferin County, ON

Lead Engineer

Jamie Witherspoon

Capital Cost

$200K

Design

2022

Services

Small Water Systems

Post New Triplex UV Installation
Post - New Triplex UV Installation
Post New Booster Pump System On Existing Storage Tank
Post - New Booster Pump System on Existing Storage Tank